We analyze technical feasibility, materials, volumes and logistics before quoting. We optimize the design for efficient European production.
We developed a functional pattern and prototype. We validate structure, seams, reinforcements and finishes before mass production.
Manufacturing at our facilities in Europe with controlled processes and certified technical materials.
Final quality control and industrial packaging or preparation for direct shipment to the end customer.
National and international logistics management under the agreed Incoterm.
We analyze the technical and commercial viability of your project before quoting. We review technical data sheet, proposed materials, estimated volumes, delivery times and applicable Incoterm. If the design can be optimized for efficient European production, we indicate this at this stage. Typical response time: 24-48 business hours after receiving full documentation.
We develop a pattern and functional prototype based on your specifications. We validate structure, load seams, reinforcements, finishes and materials before approving mass production. The cost of the sample is deducted from the first order. Estimated time: 2 to 3 weeks from technical approval. We include iterations until final validation on your part.
We manufacture at our facilities in Spain with controlled processes and certified technical materials: Cordura®, ballistic nylon, PVC polyester and laminated technical canvas. Industrial triple drag and high frequency welding machinery for waterproof products. Active order tracking with status update and deadline control at each phase.
Final quality control on 100% of the units: verification of dimensions, structural seams, hardware and finishes. Packaging adapted to your operation: standard industrial packaging, packaging with your brand or preparation for direct shipment to the end customer (fulfillment). Control documentation available upon request.
National and international logistics management under the agreed Incoterm (EXW, FCA, DAP or DDP). Common destinations: Germany, France, the Netherlands, the United Kingdom and the rest of Europe. Estimated delivery time from Spain: 2 to 5 working days. Export documentation included.
We work with industrial heavy sewing machinery (triple drag, walking foot), high-frequency welding equipment for PVC and cutting systems for technical textiles.
Industrial zippers (YKK® or equivalent), reinforced buckles, metal rings, industrial velcro, magnetic closures and customized components.
plasticized polyester PVC, Cordura®, ballistic nylon, resined fabrics, technical canvas and laminated textiles depending on the application.
High tenacity polyester yarns, UV resistant and prepared for structural seams and load points.